Hurricane Irene swept away the existing unattached Parish Hall and knocked the church off the foundation. The sturdy little church was placed on a new foundation. Mgfdesigns as the lead architect worked in collaboration with Responsive Designs to design a new attached fully handicapped accessible Parish Hall.